SR CL Bear Creek
SR CL Jackson
SR CL Arcadia South
Annual MWh Production (All Projects)
Energy output over 40-year project lifetime with 0.3% annual degradation
Annual CO₂ Avoided — Bear Creek
WattTime MOER vs TCR LMER (MWh) methodology comparison (metric tons CO₂)
Annual CO₂ Avoided — Jackson
WattTime MOER vs TCR LMER (MWh) methodology comparison (metric tons CO₂)
Annual CO₂ Avoided — Arcadia South
WattTime MOER vs TCR LMER (MWh) methodology comparison (metric tons CO₂)
Cumulative CO₂ Avoided (All Projects)
Running total of avoided emissions using TCR LMER method (metric tons CO₂)
Bear Creek — Emission Rate Comparison
WattTime MOER (solid gray) vs TCR LMER MWh rate (dotted) in metric tons CO₂/MWh
Jackson — Emission Rate Comparison
WattTime MOER (solid gray) vs TCR LMER MWh rate (dotted) in metric tons CO₂/MWh
Arcadia South — Emission Rate Comparison
WattTime MOER (solid gray) vs TCR LMER MWh rate (dotted) in metric tons CO₂/MWh
TCR LMER % of Initial Value
How each project's local LMER changes relative to Year 1 baseline
Avg Implied PV LMER by Market (2026–2045)
Annual average implied PV LMER (metric tons CO₂/MWh) — toggle markets below
Project Summary Comparison
Key metrics side by side across all three projects
| Metric | Bear Creek | Jackson | Arcadia South |
|---|---|---|---|
| Grid / Utility | Alabama Power (SOCO) | TVA | Entergy (MISO) |
| State | Alabama | Tennessee | Louisiana |
| Capacity (DC) | 6,066 kW | 1,420 kW | 6,080 kW |
| MOER (lbs CO₂/MWh, 2025) | 1,212.6 | 1,151.9 | 1,360.0 |
| Year 1 Generation (MWh/MW) | 1,676 | 1,687 | 1,736 |
| Total MWh (40 yr) | 383,731 | 90,403 | 398,917 |
| CO₂ Avoided — WattTime MOER (t) | 211,034 | 47,228 | 246,044 |
| CO₂ Avoided — TCR LMER/MWh (t) | 172,661 | 42,130 | 160,062 |
| TCR vs MOER ratio | −18.2% | −10.8% | −34.9% |
| Degradation Factor (annual) | 0.3% | 0.3% | 0.3% |
| Avg % Max Production (40 yr) | 93.85% | 93.85% | 93.85% |
Annual Data — All Projects
Select a project to view year-by-year breakdown